Saturday, February 8, 2014

Bathroom renovation

The existing second floor bathroom was not original to the house. It was done about 1970 without a permit. The existing shower was rusty and leaked. The bathroom was created by dividing an existing bedroom into a walk in closet and the bathroom. The wall was oddly placed splitting a double window in half.

We decided to make the bathroom legal and create a master bath. We hired an architect to draw up plans and are using a contractor who has done work for us before. They are a small group...and it is taking time, but is moving along. Here are some photos of where we are at.

New insulation.

New tub nook.

Keeping the door to the walk in attic in the new bathroom.

Double window replace last year without the old wall in the middle of it.